{"id":601,"date":"2025-12-09T08:00:20","date_gmt":"2025-12-09T08:00:20","guid":{"rendered":"https:\/\/ccs-baltic.eu\/?p=601"},"modified":"2025-12-09T13:27:34","modified_gmt":"2025-12-09T13:27:34","slug":"europos-komisija-patvirtino-ccs-baltic-consortium-pci-statusa","status":"publish","type":"post","link":"https:\/\/ccs-baltic.eu\/lt\/2025\/12\/09\/european-commission-confirms-pci-status-for-the-ccs-baltic-consortium\/","title":{"rendered":"Europos Komisija patvirtino \u201eCCS Baltic Consortium\u201c PCI status\u0105"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Gruod. 9, 2025<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pra\u0117jusi\u0105 savait\u0119 Briuselyje vykusi\u0173 Europos Komisijos organizuot\u0173 \u201ePCI Energy Days\u201c, skirt\u0173 praktiniam bendro intereso projekt\u0173 (PCI) ir abipusio intereso projekt\u0173 (PMI) \u012fgyvendinimui, metu \u201eCCS Baltic Consortium\u201c projekto partneriai sulauk\u0117 svarbios ir d\u017eiuginan\u010dios \u017einios. Europos Komisija oficialiai patvirtino \u201eCCS Baltic Consortium\u201c bendro intereso projekto (PCI) status\u0105. Tai pirmasis tarpvalstybinis CO\u2082 surinkimo, transportavimo ir saugojimo projektas tarp Lietuvos ir Latvijos, apimantis CO\u2082 perkrovos terminal\u0105 Klaip\u0117doje.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">PCI statusas rei\u0161kia, kad projektas pripa\u017e\u012fstamas svarbia tarpvalstybin\u0117s energetikos infrastrukt\u016bros dalimi, reik\u0161mingai prisidedan\u010dia prie Europos S\u0105jungos energetikos politikos ir klimato tiksl\u0173 \u012fgyvendinimo. \u201eCCS Baltic Consortium\u201c projektui PCI statusas pirm\u0105 kart\u0105 suteiktas 2023 m. Kadangi \u0161is statusas turi b\u016bti atnaujinamas kas dvejus metus, s\u0117kmingas jo patvirtinimas yra svarbus projekto \u012fgyvendinimo etapas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Naujai paskelbtame antrajame PCI\/PMI s\u0105ra\u0161e \u201eCCS Baltic Consortium\u201c CO\u2082 infrastrukt\u016bros projektas \u012ftrauktas \u012f platesn\u012f 235 tarpvalstybini\u0173 energetikos projekt\u0173 visoje Europoje s\u0105ra\u0161\u0105, kuriame yra ir 17 anglies dioksido surinkimo ir ilgalaikio saugojimo infrastrukt\u016bros projekt\u0173. \u012etraukimas \u012f \u0161\u012f s\u0105ra\u0161\u0105 suteikia projektui galimyb\u0119 pretenduoti \u012f Europos S\u0105jungos finansavim\u0105 pagal Europos infrastrukt\u016bros tinkl\u0173 priemon\u0119 (CEF), taip pat pasinaudoti supaprastintomis leidim\u0173 i\u0161davimo ir reguliavimo proced\u016bromis \u2013 svarbiomis priemon\u0117mis, padedan\u010diomis spartinti projekto \u012fgyvendinim\u0105.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Daugiau informacijos: <a href=\"https:\/\/ec.europa.eu\/commission\/presscorner\/detail\/lt\/ip_25_2758\" target=\"_blank\" rel=\"noopener\">Komisija didina energetikos tinkl\u0173 sujungiamum\u0105 visoje Europoje ir u\u017e jos rib\u0173 remdama 235 tarpvalstybinius projektus<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/ccs-baltic.eu\/wp-content\/uploads\/2025\/12\/PCI-Days-1024x768.jpg\" alt=\"\" class=\"wp-image-602\" style=\"width:779px;height:auto\" srcset=\"https:\/\/ccs-baltic.eu\/wp-content\/uploads\/2025\/12\/PCI-Days-980x735.jpg 980w, https:\/\/ccs-baltic.eu\/wp-content\/uploads\/2025\/12\/PCI-Days-480x360.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1024px, 100vw\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>Dec 9, 2025 Last week, during the PCI Energy Days hosted by the European Commission in Brussels and dedicated to the practical implementation of PCIs and PMIs, CCS Baltic Consortium partners received important and encouraging news. The European Commission has officially confirmed the Project of Common Interest (PCI) status for the CCS Baltic Consortium \u2013 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":602,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-601","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/posts\/601","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/comments?post=601"}],"version-history":[{"count":4,"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/posts\/601\/revisions"}],"predecessor-version":[{"id":628,"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/posts\/601\/revisions\/628"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/media\/602"}],"wp:attachment":[{"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/media?parent=601"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/categories?post=601"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/tags?post=601"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}