{"id":847,"date":"2026-03-19T08:21:43","date_gmt":"2026-03-19T08:21:43","guid":{"rendered":"https:\/\/ccs-baltic.eu\/?p=847"},"modified":"2026-03-19T08:22:17","modified_gmt":"2026-03-19T08:22:17","slug":"feed-agreement-signed-for-the-planned-co%e2%82%82-transshipment-terminal-in-klaipeda","status":"publish","type":"post","link":"https:\/\/ccs-baltic.eu\/lt\/2026\/03\/19\/feed-agreement-signed-for-the-planned-co%e2%82%82-transshipment-terminal-in-klaipeda\/","title":{"rendered":"FEED agreement signed for the planned CO\u2082 transshipment terminal in Klaip\u0117da"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Mar 19, 2026<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><strong>International energy terminal operator KN Energies has selected the Norwegian engineering company Aker Solutions as the service provider for front-end engineering and design (FEED) services related to the design and construction of the planned carbon dioxide (CO\u2082) transshipment terminal in Klaip\u0117da.\u00a0<\/strong><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Klaip\u0117da CO\u2082 terminal project forms part of the CCS Baltic Consortium, which aims to develop the first cross-border carbon capture, transport, and storage (CCS) network in the Baltic region. To create a complete CCS value chain, the CCS Baltic Consortium project was established in 2022, with KN Energies acting as both coordinator and partner.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Once implemented, the project will enable CO\u2082 to be captured from various industrial companies across the Baltic region, transported to the terminal in Klaip\u0117da, and shipped by sea to long-term geological storage sites located under the seabed of the North Sea.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The CO\u2082 transshipment terminal infrastructure in Klaip\u0117da will commence its operations with two cement plants operating in Lithuania and Latvia. At the same time, the facility will operate on an open-access basis, allowing third parties to access the infrastructure and enabling additional sectors and companies to connect, thereby promoting the application of CCS technologies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As part of the FEED, Aker Solutions will build upon findings from previous phase technical evaluations to further refine the technical design specification of the planned infrastructure as well as evaluate potential expansion routes for facility development.&nbsp;<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">\u201cThe successful procurement of a FEED contractor for Klaip\u0117da liquid CO\u2082 terminal marks an important milestone in CCS Baltic Consortium development and commitment of KN Energies to further increase maturity of this project of EU Common Interest. I am confident that by combining KN Energies\u2019 proven global operational experience in marine cryogenic and liquid terminals management, with Aker Solutions\u2019 deep engineering expertise \u2013 built across decades of delivering complex CO\u2082, energy, and cryogenic infrastructure projects worldwide \u2013 places KN Energies in a strong position to provide efficient and scalable solutions for the Baltic region.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As the terminal advances into the FEED stage, KN Energies is reinforcing its commitment to providing reliable, safe, and customer-centric CO\u2082 logistics services for industrial emitters in both Latvia and Lithuania \u2013 supporting regional decarbonization ambitions and enabling a fully integrated cross-border CO\u2082 value chain,\u201d said Linas Kilda, Chief Business Development Officer at KN Energies.<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">Aker Solutions has been designing and delivering CO\u2082 infrastructure projects since the 1990s, with experience spanning the full CCS value chain, from carbon capture integration to CO\u2082 transport, terminal and hub infrastructure, and permanent storage. As a systems integrator, the company continues to advance technical solutions that enable the efficient and scalable development of CCS.&nbsp;<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">\u201cBuilding on more than 30 years of CCS experience, as well as learnings from first-of-a-kind projects such as Northern Lights, Brevik and Oslo CCS, we are proud to support KN Energies in realizing this flagship project which is of great importance to the Baltic region, as well as wider Europe,\u201d said Henrik Inadomi, Executive Vice President of New Energies at Aker Solutions.\u00a0<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">In 2024, the European Commission granted the CCS Baltic Consortium project the status of a Project of Common Interest (PCI), recognizing it as an important cross-border infrastructure project that makes a significant contribution to the implementation of European Union energy policy and climate objectives.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project is co-funded by the EU under the Connecting Europe Facility (CEF) for Energy programme.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>KN Energies is an international energy terminal operator that ensures safe and reliable flows of liquid energy products and liquefied natural gas (LNG) for users in the Baltic Sea region. The company helps clients worldwide develop sustainable energy infrastructure projects with its knowledge and skills. KN Energies currently operates three liquid energy product terminals in Lithuania and operates LNG terminals in Lithuania, Germany, and Brazil.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Aker Solutions is a Norwegian engineering company that provides integrated solutions, products, and services for the global energy industry. The company supports both traditional oil and gas projects and the transition to low-carbon energy, including offshore wind, electrification, and carbon capture and storage (CCS).<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"689\" src=\"https:\/\/ccs-baltic.eu\/wp-content\/uploads\/2026\/03\/LinkedIn-postai-1040-x-788-px-5-1024x689.png\" alt=\"\" class=\"wp-image-848\" style=\"width:827px;height:auto\" srcset=\"https:\/\/ccs-baltic.eu\/wp-content\/uploads\/2026\/03\/LinkedIn-postai-1040-x-788-px-5-1024x689.png 1024w, https:\/\/ccs-baltic.eu\/wp-content\/uploads\/2026\/03\/LinkedIn-postai-1040-x-788-px-5-980x660.png 980w, https:\/\/ccs-baltic.eu\/wp-content\/uploads\/2026\/03\/LinkedIn-postai-1040-x-788-px-5-480x323.png 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1024px, 100vw\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>Mar 19, 2026 International energy terminal operator KN Energies has selected the Norwegian engineering company Aker Solutions as the service provider for front-end engineering and design (FEED) services related to the design and construction of the planned carbon dioxide (CO\u2082) transshipment terminal in Klaip\u0117da.\u00a0 Klaip\u0117da CO\u2082 terminal project forms part of the CCS Baltic Consortium, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":848,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-847","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/posts\/847","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/comments?post=847"}],"version-history":[{"count":1,"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/posts\/847\/revisions"}],"predecessor-version":[{"id":849,"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/posts\/847\/revisions\/849"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/media\/848"}],"wp:attachment":[{"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/media?parent=847"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/categories?post=847"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ccs-baltic.eu\/lt\/wp-json\/wp\/v2\/tags?post=847"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}